Production of concrete mix-Station Employee Management System
⑴ concrete mixing station or project manager, the department issued a directive does not turn on.
⑵ without licenses terminate or shut down for maintenance must.
⑶ exact input mix, carefully use all the input data, can be officers of the tests, operator identified and then signed the protocol established.
D strictly according to the production mix, no laboratory test written instructions to employees, individuals may not arbitrarily increase or decrease in raw materials, additives and water. Mixing time depending on the specific condition, without the consent of the testing personnel should be made to increase or decrease.
⑸ production should observe the accuracy of the measurement should be accurate, adjust the gap between the specified error. All measurements to no loading time are within the range of minimum value. Other abnormal situation must be reported in due time your measurement system.
⑹ fault cement, admixtures, water must be excluded ± 1%, if found, the quality of cement, additives, not enough, Twisted Dragon in a timely way is blocked, and once set should not be found error ± 2%, should find reasons and in a timely manner when excessive error messages and manual compensation.
⑺ At discharge, tank inlet and outlet should be aligned, preventing missed.
⑻ work completed, turn the following switches:
① water pump power switch;
② master power switch;
③ the master control switch;
④ Change additive pump;
⑤ Change air compressor;
⑼ within two hours after the order is completed, will host all exposed concrete parts are clean, not a Trojan horse for a while cleanup occurs surprise behavior.
⑽ blackout occurs in the production of concrete, immediate manual unloading, cleaning and similar parts.
⑾ by mixing station strictly follow the instructions.
⑿ before the start of production equipment and coordination, when for the first time not less ringing than 10 seconds to confirm maintenance staff that the mechanical work did not exist Parts are not obstacles on the call in and then played the second bell, should not less than 6 seconds. Stop devices before they can be executed after 6 seconds.
⒀ equipment manuals, specification requirements of the plant at regular intervals from all types of electronic weighing equipment calibration Effectiveness (Calibration with standard weights and then body weigh), look at the conditions and recording the measurement error calibration tests, calibration, the employee shall be notified at the same time.